摘要 围岩松动圈是评价围岩稳定性的重要参数之一,文章结合大断面小净距鹤上隧道的工程实践,采用声波法和多点位移计法对隧道围岩松动圈进行了测试分析,获得了整个隧道断面松动圈的分布;基于测试结果,验证了该隧道锚杆设计支护参数的合理性,为围岩松动圈支护参数的确定提供了依据和指导。 The releasing zone is one of the most critical parameters to evaluate the stability of surrounding rock. According to the construction of Heshang large- section tunnels with small spacing, the ultrasonic wave method and multi-point extensometer are applied to the measurement of releasing zone, and the distribution of releasing zone is ascertained. Based on the measured data, the rationality of bolt support is proved, and some references and instruction are also provided for the design of support system for releasing zone of surrounding rock.
出处 《地下空间与工程学报》 CSCD 2007年第3期475-478,共4页 Chinese Journal of Underground Space and Engineering
基金 福建省交通厅交通科技发展项目
关键词 鹤上隧道 松动圈 测试 超声波 多点位移计 Heshang tunnels releasing zone measurement ultrasonic wave multi - point extensometer
  • 相关文献

参考文献5

二级参考文献39

共引文献738

同被引文献241

引证文献31

二级引证文献247

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部