桥上板式无碴轨道施工方案探讨

Exploration of construction scheme for slab track on bridge
下载PDF
导出
摘要 长大桥桥上板式无碴道床的铺设施工是一项关键工序,轨道板及施工材料等组织运输是施工的重点。此文对临时轨道法、临时便道法和移动门吊法铺设桥上板式无碴轨道进行了经济、工期比较,认为移动门吊法是铺设桥上板式无碴轨道的较好方法,并对其工艺流程做了详细介绍。 The installing construction of slab track (ballasfless) bed on long and large bridges is a key process. The transport organization of track slabs and construction materials are priorities of construction. In this article, an economic and construction- time comparison is made between temporary track method, temporaft road method and traveling gantry crane method by which the slab track is laid on the bridge, which shows that the traveling gantry crane method is a better method for the installation of slab track on bridge. The article also performs a detailed introduction to the technological process of this method.
作者 成增胜
出处 《铁路工程造价管理》 2007年第4期24-27,43,共5页 Railway Engineering Cost Management
关键词 临时轨道法 临时便道法 移动门吊法 桥上板式无碴轨道 经济 工期 工艺流程 Temporary track method temporary road method traveling gantry crane method slab track on bridge economic construction time technological process
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部