摘要
阐述了影响工程工期——即工程的建设时间的几个影响因素,从而说明工程设计、管理、施工等技术人员应注重的若干问题,达到缩短整个工程建设时间的目的。
Several factors which influence the time limit for a project,i.e. all time of project construction,are expounded.Thereby several problems which the engineers should be attention to,such as design,management and construction of the project,are explained.As a result,it will achieve the gaol of shortening all time of engineering construction.
关键词
工程工期
工程进度
影响因素
工程管理
time limit for a project
rate of poject progress
influencing factor