深部立井快速施工技术研究

The study on Rapid Construction Technology of Deep Vertical Well
下载PDF
导出
摘要 乐平矿务局沿涌煤矿立井深600m,净直径5m。涟邵建工集团采用机械化配套设备施工,取得了平均月成井100m,最高月成井120m的好成绩,实现了快速施工。本文简要介绍了井筒施工机械化配套情况、施工工艺、管理制度及施工效果。 The depth of 600m, net diameter of 5m on vertical well in Yanyong Coal Mine of Leping Mining Group, Construction Company of Lianshao Mining Group adopting short digging and building combined work can fully make the ability of mechanization collecation equipment,extend new technology of umbellar borer holing and deep hole blasting and sinking by rotating grab,continuously breach an average of 100m, the maximum well 120m on the good results achieved rapid construction in 2005.Briefed the the construction of the mechanization, construction technology, management systems and Construction effect and accumulate experience in rapid construction in deep vertical well.
出处 《中国西部科技(学术版)》 2007年第7期9-10,共2页 Science and Technology of West China
关键词 立井井筒 机械化配套 混合作业 快速施工 vertical well mechanization collecation equipment combined work rapid construction
  • 相关文献

参考文献4

二级参考文献5

  • 1吴建荣.对智能建筑建设的几点看法[J].智能建筑,2001,(6):17-19.
  • 2GB/T50314-2000.智能建筑设计标准[S].[S].,..
  • 3陈振明."建筑智能化"的持续发展必须以人为本[J].智能建筑资讯,2001,(3):18-20.
  • 4杜成章.智能建筑的系统评审[J].智能建筑,2001,(6):22-26.
  • 5徐兴声.知识经济时代创新体系与智能建筑[J].建筑学报,1999(4):14-15. 被引量:18

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部