摘要
针对国信靖江发电有限公司2台60万kW机组的电厂信息化建设,从建设目标、规划方案、支撑环境、规划统一编码及信息化实施和组织机构等方面给出具体的实施方案。通过论证具有实际可行性。
Based on two 600kW - units of Jingjiang Power Plant in Jiangsu, this paper introduces the information management plan of new - building power plant from the target, blue print, support environment, uniform coding, actualization and organization. This plan is absolutely doable through argumentation.
出处
《贵州工业大学学报(自然科学版)》
CAS
2007年第3期41-44,50,共5页
Journal of Guizhou University of Technology(Natural Science Edition)
关键词
信息化规划
新建电厂
information management plan
new power plant