摘要
分析了基本建设工程中投资失控的原因,提出要有效的控制工程造价,应当将控制工程项目投资工作的重点从以往的施工阶段转移到包括项目的决策、设计阶段、实施阶段、竣工结算及后评价阶段的项目全程,特别是项目的决策与设计阶段。并按建设程序分阶段简述了做好此项工作的要点与方法。
Analysis in the capital construction engineering investment lose control of reason, put forward want valid of control the engineering build price, should the item investment of the control engineering work of point from former of construction the stage transfer to include item of decision, design stage, implement stage, finish construction balance of accounts and empress evaluation stage of the item whole distance, especially item of decision and design stage. Combine press the construction procedure cent stage Synopsis elucidation work well this work of important point and method.
出处
《福建建筑》
2007年第6期80-81,89,共3页
Fujian Architecture & Construction
关键词
投资估算
优化设计
限额设计
合同管理
健全设计变更审批制度
The investment estimate Excellent turn a design Quota design Contract management The sound design change examination and approval system