摘要
以滨海新闸工程灌注桩施工为例,介绍沿海地区复杂土层钻孔灌注桩施工工序和质量控制要点,对其施工各工序进行有效的控制,从而保证灌注桩施工的工序过程处于严格、有效的质量控制中。
Taking the example of seaside new dam project pouring pile construction, it introduces the constructing procedures and quality controlling points in coastal complex soil drilling pile, makes effective control to its construction and each procedure, so as to ensure the strict and effective quality control of pouring pile construction.
出处
《山西建筑》
2007年第21期238-240,共3页
Shanxi Architecture
关键词
钻孔灌注桩
施工工序
质量控制
drilling pouring pile construction, constructing procedures, quality controlling