摘要
介绍了一种确定网络图关键线路的新方法——结点时差法。该方法只需计算出结点最早开始时间和最迟结束时间,便可确定出网络图的关键线路。
This paper introduces a new method of determining the critical path of the network chart-node slack method. This method only needs computing the earliest start -time and the lastest finish-time of the node. Thus you work it out.