摘要
在高压电网建设施工中,采用动力伞展放导引绳协助完成架线施工,这一工艺有效地解决了工期紧张、青苗赔偿困难、大跨越施工的“老大难”问题。本文对该工艺的可行性及可操作性进行了研究和实践,以便此方法在同行业中得到更广泛的应用。
In the high-voltage electric network construction,the craft that uses dynamic parachute paying-off leading string to assist to complete overhead transmission line construction has effectively settled the “long-standing” problems of time limit for the project,shoots compensation difficulty and the great crossing construction.This paper conducts a research on the feasibility of this craft, so that it is applied more widely in the same industry.
出处
《江西电力》
2007年第3期3-5,共3页
Jiangxi Electric Power
关键词
动力伞
架线施工
导引绳
dynamic parachute
overhead transmission line construction
leading string