摘要
开敞式码头的施工,自然条件严酷而复杂。本文根据工程实例,对施工方案和船机性能的选择,作业天数的确定,以及船舶作业的气象与海况限值做了较全面的统计与分析。
In constructing open sea berths, the natural conditions shall be adverse and complicated. This paper, basedon sorne engineering cases, completely collected and analyzed the choice of construction program and the properties of ships and machinery, the determination of number of working days, the meteorology during operation ofworking boats and the limited values of sea conditions.
关键词
开敞式码头
码头
施工方案
作业天数
海况限值
open sea bearth, construction program, working days, limited value of sea conditions