摘要 2007年7月5日,华电国际邹县发电厂四期工程8号机组将正式投产发电。工程建成后,邹县发电厂装机容量可达到454万kW,将成为全国最大、国内综合节能和环保水平最高的燃煤电厂之一。文章介绍了邹县发电厂围绕节能降耗所开展的主要工作,他们通过加强节能管理体系建设、优化电源结构、狠抓设备治理和能源基础管理,使节能工作取得显著成效。指出了其目前存在的主要问题及下一步工作思路和工作措施。 The phase 4 of Huadian International Zouxian Power Plant, No. 8 Unit, will be put into service in July 2007. After the establishment of project, the capacity of Zouxian Power Plant can reach 4 540 MW, it is one of the biggest coal fired power plant in nation-wide with comprehensive energy saving and the highest level of enviromnental protection. The paper introduced the major works of energy saving and loss reducing developed by Zouxian Power Plant, such as strengthening the construction of energy-saving management system, optimizing structure of power source, grabbing equipment administration and energy basic management ruthlessly. It is pointed out the existent major problems now and the working idea in next step and the measures,
作者 谢云 王长征
出处 《电力设备》 2007年第7期7-10,共4页 Electrical Equipment
关键词 节能降耗 管理体系 设备治理 基础管理 energy saving and loss reducing management system equipment administration basic management
  • 相关文献

同被引文献10

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部