摘要 利用应变累加法,计算了钢芯铝绞线(LGJ或ACSR)的钢芯和铝线的总应变,得到其与应力和导线温度的关系.在考虑导线初伸长的基础上,利用迭代法计算了导线的弧垂.计算结果表明:对于型号为LGJ240/40的钢芯铝绞线,在档距为400m时,温度每升高10℃,弧垂增加约为0.45m. Based on the strain - summation method, total steel and aluminium strains of Aluminium Conductors Steel Reinforced wire (LGJ or ACSR) are calculated, respectively, and the relationships among them with stress and conductor temperature are obtained. The conductor sag is calculated by means of an iteration method while the conductor primary elongation is considered. The calculation results show that, when the conductor temperature is increased every 10℃, the conductor sag increases about 0. 45m for conductor LGJ240/40 with 400m span.
出处 《哈尔滨理工大学学报》 CAS 2007年第3期95-98,102,共5页 Journal of Harbin University of Science and Technology
关键词 架空输电线路 应力-应变 孤垂 overhead transmission line stress - strain sag
  • 相关文献

参考文献10

  • 1叶鸿声,龚大卫,黄伟中,赵君虎,周丹羽,沈潜,周康,袁志磊.提高导线允许温度的可行性研究和工程实施[J].电力建设,2004,25(9):1-7. 被引量:51
  • 2DL755-2001,电力系统安全稳定导则[P].2001.
  • 3李博之.高压架空输电线路施工技术手册(架线工程部分)[M].北京:水利水电出版社,1977.
  • 4NIGOL O,BARRETT J S.Development of an Accurate Model of ACSR Conductors for Calculating Sags at high Temp--Eratures Part Ⅱ[C].Documentation of Program STESS,CEA Report,1980.
  • 5BARRET J S,DUTTA S,NIGO1 O.A New Computer Model of ACSR conductors[J].IEEE Trans.on Power Appa-ratus and Systems,1983,102:614 -621.
  • 6BARRETT J S.Optimization of Conductor Design[J].IEEE Trans.on Power Delivery,1989,4:453 -460.
  • 7NIGOL O,B ARRETT J S.Characteristics of ACSR Con -ductors at High Temperatures and Stresses[J].IEEE Trans.on Power Apparatus and Systems,1981,100:485 -493.
  • 8赵英荣,沈才元,陆景德.架空绝缘电缆弧垂的计算[J].电线电缆,2001(6):39-41. 被引量:1
  • 9张殿生.电力工程高压送电线路设计手册[M].北京:水利水电出版社,1989.
  • 10刘长青,张学哲,刘胜春,董玉明,李小青.提高导线运行允许温度若干问题的探讨[J].电力设备,2004,5(8):44-47. 被引量:13