摘要
阐述250 t转炉的制造新工艺及消除应力热处理前后焊缝应力的测试。
The article covers the updated technology on fabrication of Baosteel 250 t converter and stress measurement at weld area prior to and after stress relieving heat treatment.
出处
《一重技术》
2007年第3期16-17,共2页
CFHI Technology
关键词
炉壳
转炉
新工艺
应力测试
converter shell
converter
updated technology
stress measurement