摘要
针对沥青拌合楼石料加热控制过程中存在的缺点,提出了拌合楼石料加热控制过程的改进措施,从而保证了沥青混凝土的质量,提高了经济效益,保证了工程质量和工程工期。
In light of the shortcomings existed in the process of mineral aggregate heating control in asphalt mixing plant, the author proposes the improvement for the heating control process, in order to ensure the quality of asphalt concrete, increase economic benefits, and guarantee engineering quality and time-limit.
出处
《山西建筑》
2007年第22期345-346,共2页
Shanxi Architecture
关键词
拌合楼加热
改进措施
控制系统
heating in mixing plant, improvement, control system