摘要
为了提高观测精度和可靠性,准确及时地掌握地下建筑物在运行过程中的动态变化状况,在引黄工程国际I标泵站厂房及4号隧洞安装布置了各类监测仪器,形成泵站及隧洞的安全监测自动化系统。文中简略介绍了安全监测自动化系统的布置、安装与调试过程。
NO.1 international bid of the YRDP has arranged and installed many safty monitor apparatuses .All kinds of monitor apparatuses are arranged in the workshop of pumping station and No.4 tunnel to improve the precision and credibility of observation and to master the dynamic change stage of underground buildings in motion; It forms the safety monitor automation system of pumping stations and tunnels. This paper simply introduces the arrangement, installation and adjustment test of the safety monitor automation system.
出处
《山西水利科技》
2007年第3期80-82,共3页
Shanxi Hydrotechnics
关键词
安全监测自动化
安装
调试
safety monitor automation system installation adjustment test