摘要
On May 25^th, 2007, NDRC issued the Notice of Permission on Carrying out Pre-Engineering Work for Shandong Haiyang Nuclear Power Phase I Project. This project will adopt AP1000 generation Ⅲ nuclear technologies to install two 1000-MW class pressurized water reactor units.