摘要
7414厂联合井式电炉始建于上世纪70年代,因受当时技术条件的限制,在功能上存在一些问题,后在1995年经航天部504所改造,但运行效果还是不十分理想,为了提高控制水平,决定进行技术改造,本文对原系统存在的问题及改造方案进行分析,并对改造效果进行综合评价。
7414 factory combined well electric stove had been constructed by 1970's, it had some functional matters for the barely technical condition. It was reconstructed by 504 institute for, but the result was not ideal, for improving the control level, we do technology reform. The paper analyzed the problem in old system and alter project, at the end, the result of reform is estimated synthetically.
出处
《制造业自动化》
北大核心
2007年第7期82-86,共5页
Manufacturing Automation
关键词
联合井式电炉
控制系统
技术改造
组态王
combined well electric stove
control system
technology reform
Kingview