期刊文献+

高坝水力学中紊流数学模型的应用及改进(Ⅱ) 被引量:4

Application and Improvement of Turbulent Model in High Dam Hydraulics
下载PDF
导出
摘要 介绍了采用紊流模型和有限体积方法,通过数值模拟解决几类典型的高坝水力学问题:(1)水垫塘三元典型流态模拟、水垫塘水体消能分区;(2)具有未知底边界的冲刷坑水流模拟;(3)洞塞消能、竖井旋流式消能和龙抬头式泄洪洞反弧段的流场模拟;(4)掺气挑坎形成的高紊动掺气水流的流场模拟。这些问题来源于实际工程,成果也已应用于工程设计中。 This paper introduces turbulent model and finite volume method. Hydraulic problems on high dam are solved by numerical simulation. Four typical study cases are introduced in the paper: (1) 3D flow pattern simulation in cushion pool , the regionalization of cushion pool regarding energy dissipation; (2) flow pattern simulation in scouring pool with the moving boundaries; (3) flow field simulation in shaft spillway with whirling current as well as flow on ogee dam in flooding tunnel with high inlet ; (4) strong aerification turbulent flow formed by air entrainment on aerated weir. All these cases are from real hydraulic engineering projects and the study results have been applied to engineering design.
出处 《水电能源科学》 2007年第4期54-57,共4页 Water Resources and Power
关键词 高坝水力学 紊流数学模型 数值方法 改进 综述 high dam hydraulics turbulent model numerical simulation improvement survey
  • 相关文献

参考文献5

二级参考文献13

  • 1中国水利水电科学研究院水力学所.沙牌水电站导流洞改建旋涡式竖井溢洪道水工试验研究报告[R].,1995.2.
  • 2Hirt C W, Nichols B D. Volume of fluid (VOF) Method for the Dynamics of Free Boundaries[J]. J. Comput. Phys.,1981, 39: 201-225.
  • 3许唯临,水利学报,1990年,10期
  • 4金忠青,N.S方程的数值解和紊流模型,1989年
  • 5姚仲达,水利学报,1984年,6期
  • 6孙思慧,泄水建筑物消能防冲论文集,1980年
  • 7许唯临,Proc 2nd Int Conf on Hydro-Science and Engineering,1995年,317页
  • 8陈永全,水利学报,1993年,4期,48页
  • 9许唯临,J Hydrodynamics B,1991年,3卷,1期,82页
  • 10杨永全,水动力学研究与进展.A,1991年,6卷,4期,36页

共引文献96

同被引文献28

引证文献4

二级引证文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部