摘要
结合黑麋峰抽水蓄能电站的实际特点,深入分析各种不同起动方式下可能产生的影响因素、合理选择首台机组首次起动方式,以确保合理可行的水库蓄水计划安排及机组安全、稳定、经济运行。
According to the characteristics of Heimifeng Pumped Storage Power Station, this paper analyzes deeply the impacting factors that would be possibly generated by various start-up modes, rationally selects the mode for the first start-up way of the first unit so as to ensure a rational and feasible arrangement of the reservoir storage and the safe, steady and economic operation of the unit.