摘要
本文结合漳浦县县城东东旭路建设管理的实践,阐述建设单位在该工程项目建设各阶段管理的重点、体会与经验。由于建设单位对各阶段全程有效、高效地管理,保证了项目的顺利建设。
This text combines the fulfillment of[ with ] the zhangzhou city east east Sun road in river bank County County construction management, elaborating the construction unit to constuct the point that each stage manage and realize with experience in the engineering's item. Because the construction unit is valid to each stage whole distanceses, management efficiently, promise the smooth construction of the item.
出处
《福建建筑》
2007年第7期83-84,87,共3页
Fujian Architecture & Construction
关键词
工程项目
建设单位
管理
Engineering item Constuct unit Manage