摘要
在论述工程地质勘测及围岩工程地质分类评分的基础上,总结并评价了张峰水库总干21号至26号隧洞工程地质条件。
Based on expounding the engineering geological investigation and geological classification grading of surrounding rock engineering, this paper sums up and evaluates the geological conditions of 21# to 26# tunnels of the Main Trunk of Zhangfeng Reservoir.
出处
《科技情报开发与经济》
2007年第20期167-169,共3页
Sci-Tech Information Development & Economy
关键词
输水线路
围岩工程
张峰水库
hydraulic line
engineering of surrounding rock
Zhangfeng Reservoir