期刊文献+

Application of ANSYS 3D FEM in Studies of Surface Deformation Caused by Pipe Jacking 被引量:10

Application of ANSYS 3D FEM in Studies of Surface Deformation Caused by Pipe Jacking
下载PDF
导出
摘要 By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface. By using site observation data and establishing 3D model using ANSYS software, this paper has discussed the strain change of stratum stress during process of jacking-in and the impact of machine head on ground surface under different frontal resistances. Analysis of the two cases shows that soil pressure reaches its maximum point when the soil is right above machine head, and soil stress will gradually decline when machine head passes over it. It also shows that impact brought by pipe-jacking construction on stress change of the surrounding soil is limited. The thesis suggest that road surface should be consolidated and soil condition be improved before construction to prevent loss and disaster caused by road surface deformation, jacking force can be increased so that jacking efficiency can be enhanced when ground stratum is well filled with soil, but the frontal resistance facing machine head should be equal to surrounding soil pressure in order to avoid rise of ground surface.
出处 《Wuhan University Journal of Natural Sciences》 CAS 2007年第4期633-637,共5页 武汉大学学报(自然科学英文版)
基金 the Science and Technology Foundation of Sichuan Department of Land and Resources(SCDLR0609)
关键词 trenchless technology pipe jacking finite element ground settlement trenchless technology pipe jacking finite element ground settlement
  • 相关文献

参考文献10

  • 1Abe T,Sogimoto Y,Ishishara K.Development and Applica- tion of Environmentally Acceptable New Soft Ground Tunnel- ing Method[]..1978
  • 2Yi Hongwei.Research on Soil Disturbance and Ground Movement Induced by Shield Tunneling[]..1999
  • 3Fang Congqi.Research on the Ground Moving of Pipe Jack- ing Construction Base on Analytical Method[]..1998
  • 4Haslem R F.Pipe-Jacking Forces: from Practice to Theory[]..1986
  • 5Song Yong,Ai Yanqing,Liang Bo.Familiarity ANSYS7.0 Finite Element Analysis[]..2004
  • 6Baosong M,Stein D,Jiang G S.Pipe Jacking & MicrotunnelTechnology[]..2004
  • 7Duan Z Y.Ground Movement Associated with Microtunnel- ling[]..2001
  • 8Chen Qimin.Research Methods on the Prediction of the Ground Settlement Induced by Informatization Construction of Pipe Jacking[]..2000
  • 9Chen Huifa,Yu Tianqing.Civil Engineering Material Consti- tutive Equations[]..2001
  • 10Milligan G W E,Norris P.Pipe-Soil Interaction during Pipe Jacking[].Proc Instn Civ Engrs Geotech Engng.1999

同被引文献77