期刊文献+

Risk Analysis on Groundwater Resources Carrying Capacity Based on Blind Number Theory 被引量:5

Risk Analysis on Groundwater Resources Carrying Capacity Based on Blind Number Theory
下载PDF
导出
摘要 Blind numbers of evaluation indices about groundwater resources carrying capacity are defined from the concomitancy of randomness, fuzziness, grey property and unascertainment of groundwater system. Based on fuzzy theory, a comprehensive evaluation model on groundwater resources carrying capacity is constructed with blind information. Then a risk assessment model of surcharge about groundwater resources carrying capacity is established on blind reliability theory. The probable value "*" matrix of fuzzy membership degree about carrying capacity corresponding to each judgment level can be obtained with the aid of blind algorithm as well as the subjective reliability "×" matrix. And then a graph of "groundwater carrying capacity v.s. accumulative reliability" can be gained Based on the graph, fuzzy membership degree of groundwater resources carrying capacity to each judgment level under different risk probability can be got. Thus, a comparatively reasonable judgment to groundwater resources carrying capacity might be obtained, with comprehensive analysis to the state of society, economy technology and ecology. Blind numbers of evaluation indices about groundwater resources carrying capacity are defined from the concomitancy of randomness, fuzziness, grey property and unascertainment of groundwater system. Based on fuzzy theory, a comprehensive evaluation model on groundwater resources carrying capacity is constructed with blind information. Then a risk assessment model of surcharge about groundwater resources carrying capacity is established on blind reliability theory. The probable value "*" matrix of fuzzy membership degree about carrying capacity corresponding to each judgment level can be obtained with the aid of blind algorithm as well as the subjective reliability "×" matrix. And then a graph of "groundwater carrying capacity v.s. accumulative reliability" can be gained Based on the graph, fuzzy membership degree of groundwater resources carrying capacity to each judgment level under different risk probability can be got. Thus, a comparatively reasonable judgment to groundwater resources carrying capacity might be obtained, with comprehensive analysis to the state of society, economy technology and ecology.
出处 《Wuhan University Journal of Natural Sciences》 CAS 2007年第4期669-676,共8页 武汉大学学报(自然科学英文版)
基金 the Key Generalization Program of Science and Tech-nology Achievement of Water Resources Ministry of China (TG0608)
关键词 blind number theory groundwater resources carrying capacity evaluation risk analysis blind number theory groundwater resources carrying capacity evaluation risk analysis
  • 相关文献

参考文献6

二级参考文献22

  • 1许有鹏.干旱区水资源承载能力综合评价研究——以新疆和田河流域为例[J].自然资源学报,1993,8(3):229-237. 被引量:271
  • 2西北干旱区水资源考察报告[J].地球科学进展,1996,11(1):1-4. 被引量:16
  • 3山西省农业区划委员会.山西省农业自然资源丛书-运城地区卷[M].北京:中国地图出版社,1991.158-192.
  • 4林衍,系统工程理论方法应用,1997年,6卷,2期
  • 5任若恩,多元统计数据分析,1997年,92页
  • 6水利电力部水利水电规划设计院,中国水资源利用,1989年,114页
  • 7许新宜,华北地区宏观经济水资源规划理论与方法,1997年,24页
  • 8中国土地资源生产能力及人口承载量研究课题,中国土地资源生产能力及人口承载量研究,1991年,4页
  • 9邓楠,可持续发展.人类关怀未来,1988年,21页
  • 10Daily G C, Ehrlich PR. Socioeconomic equity, sustainability, and earth carrying capacity [ J]. Ecological Applica-tion, 1996, 6 (4) : 991 -1 001.

共引文献649

同被引文献68

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部