期刊文献+

对中国潜在的煤层气CDM项目的风险分析和风险控制

Risk analysis and control for potential coal bed methane CDM projects of china
下载PDF
导出
摘要 如何最大限度地避免煤层气CDM项目中的风险,降低成本是目前和今后在开发中国煤层气CDM项目中急需解决的问题。本文详细分析了中国潜在的煤层气CDM项目中存在的各种风险,包括项目开发地点的风险,对周边市场的供应和需求风险,对潜在的煤层气CDM项目的审批、注册和核证风险,分析了煤层气CDM项目中CERs的交付风险、价格风险、汇率风险和国际谈判风险,提出了煤层气CDM项目的风险分摊机制,指出了在CDM项目中买卖双方以及中介各自应该承担的风险。 How to maximum avoid risks in CDM projects of coal bed methane, how to decrease the cost in developing CDM projects are current and further urgent problems that have to be solved in China. This paper analyzed risks in potential CDM projects of China Coal Bed Methane projects, including selecting project sites, analysis market supply and demand risk for Coal Bed Methane in nearby region of coal mines, analyzed each risk in verification, registration and validation, gave risk apportion measures and point out that all risks should be taken by different participates, such as buyer, seller and broker.
作者 徐向阳
出处 《中国矿业》 北大核心 2007年第7期1-4,共4页 China Mining Magazine
基金 教育部留学人员科研启动基金"中国煤层气CDM项目研究"(国外司留[2006]331号)
关键词 清洁发展机制(CDM) 煤层气(CBM) 风险分析 核定减排量(CERs) 减排购买协议(ERPA) clean development mechanism (CDM) coal bed methane (CBM) risk analysis certified emission reductions (CERs) Emission Reduction Purchase Agreement (ERPA)
  • 相关文献

参考文献4

  • 1Huang Shengchu et al. Optimal Projects for China's Coal Mine Methane Mitigation.
  • 2卡尔.舒尔兹,刘馨.CDM机制对中国煤矿区煤层气产业的影响[J].中国煤层气,2005,2(1):8-13. 被引量:6
  • 3张遂安.煤层气勘探理论的探索与实践[D].2005第五届国际煤层气论坛论文集,2005.98.
  • 4http: //cdm. unfccc.int/methodologies

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部