摘要
对华能玉环电厂1000MW机组在试运期间出现的爆管情况进行总结。从设备缺陷、异物堵塞、错用管材与焊材、焊接、机组启动和调试等方面对爆管进行分析,提出措施。
This paper summarizes pipe burst of Huaneng Yuhuan Power Plant 1 000 MW unit during trail run. It analyses pipe burst in aspects including equipment defects, foreign object plugging, mistakes in pipe and welding materials, welding, unit startup and debugging, etc. Preventive measures are also brought forward.
出处
《电力建设》
2007年第8期38-39,43,共3页
Electric Power Construction