摘要
冬季混凝土施工一直以来都被认为是混凝土施工中的难点,它与混凝土常温施工有很大的不同。现从保证混凝土施工质量和提高施工效率的角度出发进行了一些温控计算,并较全面的叙述了曲逆河北支排洪涵洞冬季施工对各工序采取的温度控制措施。
Winter Concrete Construction has long been considered a crux for concrete. It is vastly different from concrete construction in normal temperature, Considering concrete construction quality assurance and improving efficiency, and more comprehensive description of the winter construction process in the north drainage culvert of the Qunihe River on the temperature control measures was given for helping the builders in the future construction.
出处
《南水北调与水利科技》
CAS
CSCD
2007年第B06期35-37,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
冬季
排洪涵洞
热工计算
控制措施
winter
drainage culvert
thermal calculation
control measures