摘要
分析了南水北调京石段S8标渠道施工建设管理的特点;对渠道施工实践作了介绍;并对南水北调渠道施工提出探索性建议。
The characteristics of S8 section canal construction management is analyzed in the Beijing-Shijiazhuang section of the Middle Route in the South-to-North Water Transfer Project. It is introduced the canal construction practice and some suggestions are put forward.
出处
《南水北调与水利科技》
CAS
CSCD
2007年第B06期107-109,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
南水北调
渠道衬砌
施工管理
South-to-North Water Transfers canal lining
Construction management