施工项目的成本管理,始终是项目管理的一个主线,一个项目最终的目标是要在保证工程质量、进度达到合同预期的目标,必须要考虑成本。
Construction safety is the basis of the construction to the South-to-North Water Transfer Project in order to ensure the project quality, schedule and investment. In this case, the organization of safety management should be setup under the leadership of the directors, the special personnel should be responsible for safety, and the investment should be increased. The regulation system must be constructed and use this system to manage the project. The education and training for safety, especially to the farmer worker, is another key point.