摘要
南水北调移民占迁调查工作是一项复杂的系统工程,工作涉及面广,关系复杂,技术性强,涉及的专业知识众多,而搞好移民占迁调查工作,是整个南水北调移民规划设计的基础,是工程顺利实施的保证。通过对南水北调中线工程开工建筑物移民占迁实物量的调查工作,提出工程占迁实物量调查的方法,对今后的占迁实物量调查提供参考和借鉴。
Immigration resettlement in the Middle Route of the South to North Water Transfer Project is complex system engineering. The work area is broad, the relations is complicated, technically involves specialized knowledge. So doing well the immigration resettlement is foundation for the entire South to North immigration plan design, and the guarantee for the project smooth implementation. Through the quantity goods investigation we proposed the method for the immigration resettlement, which will give reference for the similar cases.
出处
《南水北调与水利科技》
CAS
CSCD
2007年第B06期130-132,共3页
South-to-North Water Transfers and Water Science & Technology
关键词
移民占迁
原则
范围
调查
方法
immigration resettlement
principle
scope3 investigation
method