期刊文献+

南水北调中线工程占迁实物量调查综述 被引量:1

Quantity Goods Investigation in the Middle Route of the South-to-North Water Transfer Project
下载PDF
导出
摘要 南水北调移民占迁调查工作是一项复杂的系统工程,工作涉及面广,关系复杂,技术性强,涉及的专业知识众多,而搞好移民占迁调查工作,是整个南水北调移民规划设计的基础,是工程顺利实施的保证。通过对南水北调中线工程开工建筑物移民占迁实物量的调查工作,提出工程占迁实物量调查的方法,对今后的占迁实物量调查提供参考和借鉴。 Immigration resettlement in the Middle Route of the South to North Water Transfer Project is complex system engineering. The work area is broad, the relations is complicated, technically involves specialized knowledge. So doing well the immigration resettlement is foundation for the entire South to North immigration plan design, and the guarantee for the project smooth implementation. Through the quantity goods investigation we proposed the method for the immigration resettlement, which will give reference for the similar cases.
出处 《南水北调与水利科技》 CAS CSCD 2007年第B06期130-132,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 移民占迁 原则 范围 调查 方法 immigration resettlement principle scope3 investigation method
  • 相关文献

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部