水利工程施工阶段对工程造价的控制和管理探析 被引量:2

Cost Control and Administrationin the Construction Phase of the Water Conservancy Project
下载PDF
导出
摘要 水利工程施工阶段资金投入量大,是工程造价形成的主要过程,如何使实际花费的资金控制在计划值内,是这个阶段造价管理的主要任务。因此,在这个阶段要通过加强工程变更价款的控制与管理,加强索赔的控制与管理,严格现场签证管理,加强结算管理,严格把好审核关等手段,有效地对工程造价进行控制,以减少或避免建设资金的流失。 The water conservancy project's construction phase is the main process of forming project's cost, which requires a large sum of investment. It's the main task of cost administration in this phase to confine the practical spending into the planning cost. It's necessary to strengthen the control and administration of project's modification price and claim for compensation, on-the-spot affirmation, the settling accounts" administration and the auditing, which will be effective in controlling the project's cost, hence reduce and avoid the loss of the construction fund.
作者 谷海青
出处 《南水北调与水利科技》 CAS CSCD 2007年第B06期133-134,138,共3页 South-to-North Water Transfers and Water Science & Technology
关键词 施工 造价 控制 管理 construction costs control administration
  • 相关文献

参考文献1

共引文献5

同被引文献14

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部