摘要
总结了“八五”期间的铁路建设成就、措施、经验,介绍了铁路“九五”期间的主要建设任务,包括加快路网建设、建设西南通道及运煤通道、配套大干线、打通限制口。同时提出了“九五”期间的工作思路,包括设计思想、项目管理、施工技术、投资控制、工程质量等。
The paper summarizes the achievements, mear-sures and experience in the Eighth 5-Year-Plan and introduces the major targets of the Ninth 5-Year-Plan in railway construction which are to quiken up railway network construction, build the southwest and coal transportation passage and lines connected with the trunk ones in order to breakdown traffic bottlenecks. The paper also puts forward envisaged work programme of the Ninth 5-Year-Plan including design thinking, project management, construction technologies, investment control, project quality and so on.
出处
《中国铁路》
1997年第3期8-11,共4页
China Railway