山东玻璃集团在线镀膜超白浮法玻璃项目为工业建筑,其中两个烟囱工程为高耸结构。通过施工方案对比分析、无井架施工体系组成及安全验算,对无井架翻模施工方法的关键程序及相应分项工程的施工要点加以论述。
The ultra-clear coating float glass line project of Shangdong Glass Group is an industrial structure in which there are two high chimneys. Discussion is given to the construction plan comparison, the makeup of non-derrick construction system and its safety calculation, the key procedures of non-derrick formwork turnover construction as well as the main construction points of related sub-works.