摘要
该文首先简要介绍了贵阳市双中心多组团发展的结构形式;其次在对现状交通进行分析的基础上详细阐述了贵阳市中心城与乌当区的第二条联系通道水东路的设计方案;最后提出了设计中存在的问题及应采取的措施。
The article briefly introduces the structural type of the double-center multi-group development in Guiyang City, then sets forth in detail the design scheme of Shuidong Road, the second linking-up passage of the central city with Wudang District in Guiyang City, finally puts forward the problems existing in the design and the measures to be taken.
出处
《城市道桥与防洪》
2007年第7期22-25,共4页
Urban Roads Bridges & Flood Control
关键词
沿河线
道路
选线
设计
自然环境
截流沟
百年洪水位
line along river, road, line selection, design, natural environment, intercepting drain, flood level in 100 years