核电站非连续性需求条件下的业务外包风险研究 被引量:1

Present Outsourcing Risk Studies under the Condition of Discontinuous Demand of Nuclear Power Plant
下载PDF
导出
摘要 在一般业务外包风险研究的基础上结合非连续性需求条件下供应风险的特点,研究了非连续性需求占优的核电站供应管理中的业务外包风险及其产生的原因。由于非连续性需求的特点,容易造成核心竞争力识别错误,容易被承包商锁定,容易失去对承包商经营状况和技术改进的跟踪,从而带来危害更大、后果更严重的风险。 Based on the present outsourcing risk studies, the risks related to outsourcing under the condition of discontinuous demand are studied, especially in the field of nuclear power plant supply management which is dominated by discontinuous demand. The characteristics of the discontinuous demand may easily induce the misunderstanding of core competency, the locked-up by suppliers at the very beginning of procurement process, the loss of following-up of suppliers and technical development, and further more the more severe risks and consequences.
出处 《管理学报》 2007年第4期460-463,共4页 Chinese Journal of Management
关键词 核电站 外包 供应风险 nuclear power plant outsourcing supply risk
  • 相关文献

参考文献9

  • 1魏其岩,田志龙.核电行业非连续性需求的供应风险[J].核科学与工程,2006,26(1):15-19. 被引量:2
  • 2[2]LLOYD,PETER.Mutual Benefit or Mutual Risk[J].Telecommunications,1993,27(2):37-42.
  • 3[3]LONSDALE C,COX A.Outsourcing:The Risks and Rewoards[J].Supuly Management,1997,2(14):32-38.
  • 4[4]LONSDALE C.Locked-in to Supplier Dominance:On the Dangers of Asset Specificity for the Outsourcing Decision[J].Journal of Supply Management,2001,37(2):26-29.
  • 5[5]DUNN L.Exploring Outsourcing[J].Plant Engineering,1999,53(3):123-125.
  • 6[6]ZSIDISIN G A,ELLRAM L M.An Agency Theory Investigation of Supply Risk Management[J].Journal of Supply Chain Mnagement,2003,39(3):15-21.
  • 7[7]ANDY L.The Ups and Downs of Outsour-cing[J].Data Communications,1993,22(2):69-76.
  • 8[8]KRALOVETZ R G.A Guide to Successful Outsourcing[J].Management Accounting,1996,78(4):32-34.
  • 9[9]盖伊 C,艾辛格 J.企业外包模式[M].华经,译.北京:机械工业出版社,2003.

二级参考文献7

  • 1Zsidisin G A. Defining Supply Risk: A Grounded Theory Approach[C]. Proceedings from the decision sciences institute annual meeting, San Diego, CA, 2002.
  • 2Zsidisin G A, Ellram L A. An agency theory investigation of supply risk management[J]. Journal of Supply Chain Management, 2003.
  • 3Chris Lonsdale, Andrew Cox. Outsourcing:The risks and rewards[J]. Supply Management, 1997.
  • 4Glenn Mc Gillivray, Commercial risk under JIT, Canadian Underwriter[J]. 2000.
  • 5Rodd Zolkos, Many companies still ignoring supply-chain risks[J]. Business Insurance, Chicago, 2003, 37 :21.
  • 6李辉,孙宝文.信息技术条件下供应链商务风险及其管理[J].财贸经济,2003,24(10):63-68. 被引量:3
  • 7姚军.供应链的风险及其防范[J].辽宁师范大学学报(自然科学版),2003,26(4):361-363. 被引量:16

共引文献1

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部