马钢A高炉于2007年2月8日点火开炉,该座高炉充分吸收国内外大型高炉的成功经验,做了充分的技术工作准备,制定了完善的开炉方案,实现了顺利开炉,迅速达产。
The blast furnace of Masteel was ignited on Feb. 2,2007. It imported those successful experiences of native and foreign blast furnace of large volume adequately. To achieve the goal of ignite fluently and yield in full, we not only did sufficient technical preparations, but also established a perfect blue print.