摘要
柳钢8号高炉密闭软水循环冷却系统投入运行后水质腐蚀严重,对系统进行不停车清洗,加入缓蚀阻垢剂MN—309,经实际生产调试,该软水系统现运行良好,水质情况大有改观。
After the willow running, the water quality tree steel 8th blast furnace airtight soft water circulating cooling system plunging into corrosion. By cleaning the system ceaselessly and joining the slow eclipse antisludging agent MN-309,this soft water system presently has operated well and the water quality situation has changed greatly after the actual production debugging.
出处
《湖南有色金属》
CAS
2007年第4期46-48,共3页
Hunan Nonferrous Metals
关键词
高炉软水
密闭循环冷却系统
腐蚀
blast furnace soft water
airtight circulating cooling system
corrode