摘要
主要介绍了宁波市芝兰桥工程主桥连续箱梁的施工,详细介绍了0号节段支架法施工、挂篮设计、墩梁锁定和解除及合拢段等的施工方案和方法,并保证了其工程质量要求,以供类似工程参考借鉴。
This paper introduces the construction of main-bridge continuous box-girder in Zhilan Bridge project in Ningbo,illustrates the construction schemes and methods of 0# subsection construction with support method,cradle design,pier locking and release,and closure section construction,in order to guarantee engineering quality requirements and to offer a reference for similar engineering.
出处
《山西建筑》
2007年第24期335-336,共2页
Shanxi Architecture
关键词
连续箱梁
支架
挂篮
墩梁固结
设计
continuous box-girder
bracket
cradle
pier consolidation
design