建设项目评标中存在问题的技术解决方法 被引量:7

Technical Solving Ways of Problems in Construction Project Bidding
原文传递
导出
摘要 针对目前工程量清单招标中存在低于成本价竞标的问题,从技术与经济相结合的角度出发,基于资源优化配置理论和劳动定额制定原则,提出了施工资源评定法和劳动生产率评定法,以提高评标办法对报价合理性和可行性的评判,从而降低低于成本价竞标者中标的可能性,维护正常的招标投标秩序。 Aimed at the problem that the bid lower than the individual cost of enterprises in Bill of Quantities bidding, this paper guided by the economics of technology theory, based on resources optimizing theory and labor quota principle, puts forward a techno-resolvent, which is evaluation on construction resource and labor productivity, to improve evaluation methods for the evaluation of the reasonableness and feasibility of quotations, thereby reducing the possibility of whose bid price lower than the cost, maintaining the normal order of bidding .
出处 《建筑经济》 北大核心 2007年第8期101-104,共4页 Construction Economy
关键词 成本价 施工资源评定法 劳动生产率评定法 cost evaluation on construction resource evaluation on labor productivity
  • 相关文献

参考文献10

二级参考文献16

  • 1胡晶莹,谈政民.工程量清单计价方式之招投标实践与有关问题探讨[J].建筑施工,2004,26(4):357-360. 被引量:6
  • 2孙金水.基本建设投资效益审计指标体系的构建[J].基建管理优化,2004,16(3):29-32. 被引量:9
  • 3波特 李明轩 邱如美译.《国家竞争优势》[M].华夏出版社,2002年1月版..
  • 4萨缪尔逊和诺德豪斯.《经济学》(第12版)[M].中国发展出版社,1992年3月版..
  • 5郭琦.工程造价管理的理论与方法[M].北京:中国电力出版社,2003.20-25.
  • 6GB50500-2003.建设工程工程量清单计价与规范[S].[S].,..
  • 7GB50500-2003.建设工程工程量清单计价规范[S].[S].,..
  • 8王群.对工程量清单招标投标工作的探讨[EB/OL].工程造价信息网,.
  • 9Chan W T, David K H Chua, Govindom Kannan. Construction Resource Scheduling with Genetic Algo\rithms[J].Journal of Construction Engineering and Management,1996,(6):126-132.
  • 10Herrera Fetal.A Model of Consensus in Group Decision Making under Linguistic Assessments[J]. F S S, 1996,(78):73-87.

共引文献100

同被引文献15

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部