摘要
淤泥土中进行深基坑开挖施工难度大;基坑周边如有距离近、荷载大的建筑物,则更不容易经济安全的施工。介绍重点工程中成功应用钢板桩支护的实例。
It is difficult to proceed with diging in the deep foundation pit of the silt soil. And if there is big loading building around the foundation pit it increase difficulty to conduct economic and safety construction . This text presents the solid example for the shoring of trench of the steel plate piles in the point engineering.
出处
《建筑技术开发》
2007年第8期22-23,共2页
Building Technology Development
关键词
钢板桩
支护
淤泥土
基坑
Steel plate piles
Shoring
Silt soil
Foundation pit