基于Monte-Carlo方法的施工导流系统综合风险分析 被引量:26

Integrated risk of construction diversion system based on the Monte-Carlo method
下载PDF
导出
摘要 施工期导流动态风险不仅与水文不确定性、水力不确定性有关,而且与坝体施工进度及其完工工期的不确定性有关。以风险分析为核心,将各种不确定性因素耦合起来研究施工导流系统的综合风险,提出施工进度计划风险分析模型和假定坝体施工进度确定条件下的施工导流风险分析模型,在此基础上,建立基于Monte-Carlo方法全面考虑水文水力不确定性以及施工进度不确定性的施工导流系统综合风险分析模型。实例分析说明,该施工导流系统综合风险研究方法和分析模型是可靠的、适用的。 Not only have hydraulic uncertainty and hydrologic uncertainty influence on dynamic risk of diversion, but also construction scheduling of dam body and its finishing and the construction scheduling uncertainty should be duration. The integrated risk between hydraulic, hydrologic uncertainty analyzed. The paper puts forward the risk analysis model for the construction scheduling and the risk analysis model for construction diversion on the assumption that the construction scheduling is affirmable. Thus the Monte-Carlo method is used to simulate the integrated risk of construction diversion system considering hydraulic, hydrologic uncertainty and the construction scheduling uncertainty. The case study shows that the research of integrated risk model for construction diversion system and its analytical method are reasonable and effective.
出处 《水科学进展》 EI CAS CSCD 北大核心 2007年第4期604-608,共5页 Advances in Water Science
基金 国家自然科学基金委员会 二滩水电开发有限责任公司雅砻江水电开发联合研究基金资助项目(50539120) 国家自然科学基金资助项目(50579056)~~
关键词 施工导流 不确定性 综合风险 MONTE-CARLO方法 construction diversion uncertainty integrated risk Monte-Carlo method
  • 相关文献

参考文献9

  • 1Ben-Chie Yen.Stochastic Methods and Reliability Analysis in Water Resources[J].Water Resources Research,1988,24(9):213-224.
  • 2Afshar A,Barkhordary A,Marino M A.Optimizing river diversion under hydraulic and hydrologic uncertainties[J].Journal of Water Resources Planning and Management,1994,120(1):36-47.
  • 3肖焕雄,孙志禹.不过水围堰超标洪水风险率计算[J].水利学报,1996,28(2):37-42. 被引量:15
  • 4Ahmed Al-Futaisi,Jery R,Stedinger.Hydraulic and economic uncertainties and flood-risk project design[J].Journal of water resources planning and management,ASCE,1999,125(6):314-324.
  • 5胡志根,刘全,贺昌海,肖焕雄,周宜红,傅峥,李定葵,郑家祥.基于Monte-Carlo方法的土石围堰挡水导流风险分析[J].水科学进展,2002,13(5):636-638. 被引量:48
  • 6Daud Nasir,Brenda McCabe,Loesie Hartono.Evaluating Risk in Construction-Schedule Model(ERIC-S):Construction Schedule Risk Model[J].Journal of Construction Engineering and Management,2003,129(5):518-527.
  • 7Abraham Warszawski,Rafael Sacks.Practical Multifactor Approach to Evaluating Risk of Investment in Engineering Projects[J].Journal of Construction Engineering and Management,2004,130(3):357-367.
  • 8王卓甫,陈登星.水利水电施工进度计划的风险分析[J].河海大学学报(自然科学版),1999,27(4):83-87. 被引量:63
  • 9水利部长江水利委员会,水利部南京水文水资源研究所.水利水电工程设计洪水手册[M].北京:中国水利水电出版社,1995.

二级参考文献16

共引文献116

同被引文献210

引证文献26

二级引证文献100

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部