摘要
通过对某大型工程建筑场地分布的浅部新近吹填土的土质情况及桩机施工场地处理方法的分析,介绍了相应的施工场地处理经验,供勘察设计等有关人员遇到类似情况时作参考。
Based on the results of analysis for the soil in newly dredged ground and the treatment method for construction ground, the relevant experiences in construction site were introduced herein, which can be referenced by engineers involving in prospecting and design work.
出处
《医药工程设计》
2007年第4期60-62,共3页
Pharmaceutical Engineering Design
关键词
吹填土
软粘性土
桩机施工
地基处理
dredged soil
soft clay
pile engine construction
processing method of base ground