5Heinemann G T, Nordman D A, Plant E C. The relationship between summer weather and summer loads-a regression analysis [J]. IEEE Trans on Power Apparatus and Systems, 1966, 85 (11) :1144 --1154.
6Gupta P C, Yamada K. Adaptive short-term forecasting of hourly loads using weather information [J]. IEEE Trans on Power Apparatus and Systems, 1972,91 (5) : 2085 -- 2094.
7Lijesen D P,Rosing J. Adaptive forecasting of hourly loads based on load measurements and weather information [J]. IEEE Trans on Power Apparatus and Systems, 1971,90(4) : 1757-- 1767.
8Song Kyung-Bin, Ha Seong-Kwan, Park Jung- Wook, et al. Hybrid load forecasting method with analysis of temperature sensitivities[J]. IEEE Trans on Power Systems, 2006,21 (2): 869-- 876.
9Chow T W S, Leung C T. Neural network based short-term load forecasting using weather compensation [J]. IEEE Trans on Power Systems, 1996,11(4) : 1736--1742.
10Nazarko J, Zalewski W. The fuzzy regression approach to peak load estimation in power distribution systems[J]. IEEE Trans on Power Systems, 1999, 14 (3) : 809-- 814.