摘要
位于长江口的上海长江隧道工程,其盾构直径和一次连续掘进距离均为世界之最。结合该隧道工程超大直径、超长距离盾构掘进,研究探讨了施工中的关键技术、技术难点与风险,并提出了相应的对策,以确保如期、优质安全地建成长江隧道工程。
Shanghai Changjiang Tunnel the largest diameter and longest once-drilling distance of shield in the world located in the Changjiang River entrance. Based on large diameter and long distance drilling of the tunnel, the paper studies and probes several keys and difficulties in technologies and puts forward related countermeasures for the purpose of ensuring scheduled quality completion of the Shanghai Changjiang Tunnel
出处
《上海建设科技》
2007年第4期47-50,53,共5页
Shanghai Construction Science & Technology
关键词
隧道
盾构
泥水
方案
tunnel shield slurry scheme