期刊文献+

高层结构质量评定方法的研究 被引量:7

Research on Evaluation Method of Tall Building Structures
原文传递
导出
摘要 目前高层结构的验收都是在一两天内完成,在如此短时间内,监理、设计和质检站等有关人员仅靠检查有关文件、资料和外观抽查,很难给出公正的工程质量评定结果。本文运用模糊数学原理,结合有验收争议的某高层结构,给出了一种高层结构质量评定的新方法。同时也给出了该结构不合格构件的加固方法。 At present time, the inspec t ion- and- accept ance of a tall building st ruc t ure has to becompleted in one or two days. As the time is so short, people responsible for inspection andcontwt for design, and those of the quality inspection station can only rely on relevantdocuments, reference materials, and spot-checks of external appearance of the structure. Thus itis rather difficult to reach a fair and impartial conclusion on the quality of the proect. Thisarticle, using the theoryof fuzzy mathematics and integrating it with a certain tall building thatroused contention during inspection, gives a new method on the evaluation of the quality of tallbuildings. It also gives a strengthening scheme for the unqualified structural members.
作者 李田
出处 《建筑结构学报》 EI CAS CSCD 北大核心 1997年第2期46-51,共6页 Journal of Building Structures
关键词 质量评定 工程验收 工程监理 模糊数学 高层建筑 quality evaluation, engineering inspection-and-acceptance, engineering inspection and control, fuzzy mathematics
  • 相关文献

参考文献9

  • 1团体著者,回弹法检测某工程23号楼混凝土强度报告,1996年
  • 2李田,建筑结构学报,1996年,17卷,2期
  • 3汪培庄,模糊系统理论与模糊计算机,1996年
  • 4匿名著者,钢结构工程质量检验评定标准(GB50221-95),1995年
  • 5团体著者,某工程24号楼底板混凝土质量检测报告,1995年
  • 6刘西拉,Microcomput Civil Eng,1994年,9卷
  • 7匿名著者,混凝土结构工程施工及验收规范(GB50204-92),1992年
  • 8王光远,工程软设计理论,1992年
  • 9匿名著者,超声法检测混凝土缺陷技术规程(CECS21.90),1990年

同被引文献25

引证文献7

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部