摘要
简要介绍润扬大桥北锚碇基础支撑钢管混凝土桩的施工条件、施工工艺和施工过程以及质量检测。
The construction condition, technology and procedure for steel pipe concrete pile supported by anchor foundation at the north,Renyang Bridge and the quality detection are introduced in the paper.
出处
《港工技术》
北大核心
2007年第4期24-27,共4页
Port Engineering Technology
关键词
润扬大桥
锚碇基础
钢管混凝土桩
Renyang bridge
anchor foundation
steel pipe concrete pile