摘要
以岚县2×300 MW矸石电厂建设项目水资源论证中关于中水水源论证为例,利用不同的方法确定城镇的污废水量,并结合污水收集能力评价中水的生产规模,根据中水水质评价结果和建设项目的水质要求,评价建设项目利用中水的可能性与利用途径,最终给出建设项目可利用中水的量。
Setting the illustrate about the water resource in the illustrate of the water resource of 2×300 MW dirt generating station construction program as example,using the different methods to confirm the quantity of sewage and combined with the collecting capacity it appraises the production capacity of mean water.And according to the appraisal outcomes of the quality of mean water and the water quality requests of construction program,appraises the likelihood of using the mean water and the use ways of construction program.In the end it gives out the quantity of the useful mean water of construction program.
出处
《山西建筑》
2007年第25期194-195,共2页
Shanxi Architecture
关键词
水资源
评价方法
排放量
污水
the water resource,the appraisal method,water discharge,sewage