摘要
针对工程进度管理需要,将网络技术应用于佛山一环项目,在计划的执行、检查、分析及调整上狠下功夫,有效地控制了工程进度,提高了项目管理水平。
According to the requirements of engineering schedule management the critical-path method is introduced in the first loop road project of Foshan.This method pays more attention on implementation,inspection,analysis and adjustment of plan,which realizes effective control of progress and increase management level of project.
出处
《山西建筑》
2007年第25期364-365,共2页
Shanxi Architecture
关键词
网络计划
进度
应用
critical-path method,progress,application