摘要
针对山西晋丰煤化工有限责任公司建设场地存在巨厚湿陷性黄土层的情况,采取现场人工挖孔扩底灌注桩、预制混凝土方桩两种地基处理试验,来探索湿陷性黄土地区的地基处理方法,为以后湿陷性黄土地基处理提供借鉴。
In view of the existence of thick wet sink layer in the earth of construction site of "Shanxi Jinfeng Coal Chemical Co., Ltd", through two kinds of foundation building experiments: digging and injection stake by human power, prefabricated concrete square stake, to explore solutions to foundation building in wet sink earth area, and provide reference to future foundation building in such earth.
出处
《山西建筑》
2007年第26期159-160,共2页
Shanxi Architecture
关键词
湿陷性黄土
地基处理
灌注桩
预制混凝土方桩
wet sink earth, foundation building, injection stake, prefabricated concrete square stake