摘要
结合河南焦新高速公路工程的施工情况,探讨了焦新高速公路改性乳化沥青上封层的施工组织设计,通过此施工组织设计的实施,效果良好,为保证在工期内全面优质地完成路面封层打下了良好的基础。
Combined with the constructing situation of expressway projects of Henan Jiaozuo, it discusses the constructing organization design of up-sealing layer on deformed bitumen of expressway. Through the execution of this constructing organization design, it has a good effect, and also ensures the accomplishment of high quality and from all aspects during the constructing period.
出处
《山西建筑》
2007年第26期195-196,共2页
Shanxi Architecture
关键词
乳化沥青
上封层
施工组织设计
emulsified bitumen, up-sealing layer, constructing organization design