摘要
在翻车机室深基坑施工中,采用了"二墙合一"地下连续墙、钢管支护等方案,并通过制定合理的土方开挖、路线及支撑方法,成功地进行地下施工,保证了质量与安全。
During deep foundation pit construction of dumper room, such schemes as "two walls into one" underground diaphragm wall and steel pipe support etc. were adopted. Through making up reasonable earth excavation methods, routes and support methods, the underground construction were successfully carried out, and quality and safety were ensured.
出处
《工程建设》
2007年第4期39-42,55,共5页
Engineering Construction
关键词
地下连续墙
基坑支护
水下混凝土浇筑
土方开挖
underground diaphragm
foundation pit support
underwaterconcreting
earth excavation